CUMBERLAND TRAIL
2003 BreakAway Pictures

Bolting down bridge decking

Taking a break

Taking a break at a water source

A pause at the overlook

Passing chainsaw

Testing rock sturdiness in drain

Checking rock placement in drain

Using a battery powered drill to attach decking

Placing a bridge stringer

Mapping trail construction progress

Using a mattock to do a sidehill cut along a steep ridge

Building rock steps requires a lot of planning and thought

An opportunity to learn of forest insects with a CT volunteer instructor

Using a chainsaw to notch the bridge sill for the pole stringer

Planning tomorrow's work

Raking leaves and debris to mark detailed route for a sidehill cut

Using a firerake to finish the sidehill cut

Trail completed during BreakAway

Removing ALL the roots

Excellent example of cribbing

Attaching bridge decking




Send mail tocumberlandtrail@rocketmail.com if you like


RETURN TO MAIN PAGE